精品国产99精品亚洲-最新日韩黄色片子-91人人妻人人澡人人狠狠-国产99re6在线观看-婷婷久久欧美色综合-亚洲熟女乱色综合亚洲图片-老熟妇精品一区二区-国产av,男人天堂-午夜av在线资源网,超碰av在线影院,久久精品国产亚洲av极品美女,久久日精品在线观看

中空玻璃加工設(shè)備?故障分析流程

時(shí)間:2025-11-14 來(lái)源:http://www.xavoip.com/ 發(fā)布人:昌盛機(jī)械

  中空玻璃加工設(shè)備故障分析流程

  Fault analysis process for insulated glass equipmentbase64_image

  在進(jìn)行故障分析時(shí),應(yīng)遵循一定的程序這種程序大致如下:

  When conducting fault analysis, a certain procedure should be followed, which is roughly as follows:

  1在保持現(xiàn)場(chǎng)的情況下進(jìn)行癥狀分析

  1. Conduct symptom analysis while maintaining the scene

  (1) 詢(xún)問(wèn)操作人員:發(fā)生了什么故障?在什么情況下、什么時(shí)間發(fā)生的?設(shè)備運(yùn)行了多久?故障發(fā)生前有何異?,F(xiàn)象(如有何聲響、報(bào)警信號(hào)、煙氣、異味)有無(wú)錯(cuò)誤操作?控制系統(tǒng)操作是否正常?操作程序有無(wú)變動(dòng)?有操作時(shí)有否特殊困難或異常?

  (1) Ask the operator: What malfunction has occurred? Under what circumstances and at what time did it occur? How long has the device been running? Are there any abnormal phenomena (such as sounds, alarm signals, smoke, odors) or incorrect operations before the fault occurs? Is the control system operating normally? Is there any change in the operating procedure? Are there any special difficulties or abnormalities during the operation?

  (2) 觀察(包括整機(jī)概況,各項(xiàng)運(yùn)行參數(shù)) 觀察有無(wú)明顯的異常現(xiàn)象?零件有卡阻或損傷?各種管線是否松動(dòng)或泄露?電纜(線)有無(wú)破裂、擦傷或燒毀?設(shè)備運(yùn)行參數(shù)有何變化?有無(wú)明顯的損壞信號(hào)?

  (2) Observe (including the overall situation of the machine and various operating parameters) to see if there are any obvious abnormal phenomena? Are the parts stuck or damaged? Are various pipelines loose or leaking? Is the cable (wire) broken, scratched, or burned? What changes have occurred in the operating parameters of the equipment? Are there any obvious signs of damage?

 ?。?) 檢查檢測(cè)指數(shù)裝置 檢查所有讀數(shù)是否正常,包括壓力或儀表讀數(shù)等。檢查過(guò)濾器、報(bào)警器及聯(lián)鎖裝置、打印輸出或顯示器是否正常。

  (3) Check the detection index device to ensure all readings are normal, including pressure or instrument readings. Check if the filters, alarms, interlocking devices, printouts, or displays are functioning properly.

 ?。?) 點(diǎn)動(dòng)設(shè)備檢查(在條件允許的情況下) 檢查間歇情況、持久情況、快或慢時(shí)的情況,這些情況是否有代表性和再現(xiàn)性,是否影響輸出,能否引起損壞或其他危險(xiǎn)。

  (4) Jogging equipment inspection (if conditions permit) checks for intermittent, persistent, fast or slow conditions, whether these conditions are representative and reproducible, whether they affect output, and whether they can cause damage or other hazards.

  2、檢查設(shè)備(包括零件、部件、系統(tǒng)線路檢查)

  2. Check equipment (including inspection of parts, components, and system circuits)

 ?。?) 利用五官進(jìn)行檢查(繼續(xù)深入觀察的過(guò)程) 摸:設(shè)備的振動(dòng)元(組)件的熱度(要注意安全!盡量用手背)。 聽(tīng):有無(wú)異常聲響。 嗅:有無(wú)焦味及其他異味; 查:工件的開(kāi)關(guān)與位置變化、設(shè)備性能參數(shù)的變化、線路異常檢查。 進(jìn)行線路檢查時(shí),應(yīng)在明確系統(tǒng)原理,熟悉系統(tǒng)接線及安裝街具體情況下進(jìn)行。 進(jìn)行線路檢查時(shí),應(yīng)在明確系統(tǒng)原理,熟悉系統(tǒng)接線及安裝街具體情況下進(jìn)行。

  (1) Using facial features for examination (continuing the process of in-depth observation), touch the temperature of the vibrating elements (components) of the equipment (pay attention to safety! Try to use the back of your hand as much as possible). Listen: Is there any abnormal sound. Smell: Check for burnt or other unusual odors; Check: changes in the switch and position of the workpiece, changes in equipment performance parameters, and inspection of circuit abnormalities. When conducting line inspections, it is necessary to clarify the system principle, familiarize oneself with the system wiring and installation details before proceeding. When conducting line inspections, it is necessary to clarify the system principle, familiarize oneself with the system wiring and installation details before proceeding.

 ?。?) 評(píng)定檢查結(jié)果 評(píng)定故障判斷是否正確,故障線索是否找到,各項(xiàng)檢查結(jié)果是否一致。

  (2) Evaluate the inspection results to determine whether the fault diagnosis is correct, whether the fault clues have been found, and whether the inspection results are consistent.

  3、故障位置的確定

  3. Determination of fault location

  (1) 確定系統(tǒng)結(jié)構(gòu)及測(cè)試方法 在熟悉設(shè)備說(shuō)明書(shū)并了解設(shè)備基本原理后,確定設(shè)備故障所在,并明確用什么方法測(cè)試,需要什么手測(cè)試手段,可能獲得什么樣的測(cè)試參數(shù)或性能參數(shù),在什么操作條件下進(jìn)行,必須遵守哪些安全措施等。

  (1) After familiarizing oneself with the equipment manual and understanding the basic principles of the equipment, determine the system structure and testing methods, identify the location of equipment faults, and clarify what methods to use for testing, what manual testing methods are required, what testing parameters or performance parameters may be obtained, under what operating conditions, and what safety measures must be followed.

 ?。?) 系統(tǒng)檢測(cè) 根據(jù)前面的分析,采用為合適的測(cè)量方法,選擇合適的測(cè)量點(diǎn),根據(jù)輸入或反饋所得結(jié)果與正常值或性能標(biāo)準(zhǔn)進(jìn)行,確定可疑位置。 系統(tǒng)檢測(cè)的方法很多,如直接比較法(與無(wú)故障的設(shè)備對(duì)比)、分步隔離法(逐步縮小檢查范圍)、變換條件法(用于故障現(xiàn)象不明顯時(shí))、試探反證法,檢測(cè)量法,試切試樣法等。

  (2) System detection is based on the previous analysis, using appropriate measurement methods, selecting appropriate measurement points, and determining suspicious locations based on input or feedback results compared to normal values or performance standards. There are many methods for system detection, such as direct comparison method (compared with equipment without faults), step-by-step isolation method (gradually narrowing the inspection scope), transformation condition method (used when the fault phenomenon is not obvious), trial and error method, detection quantity method, trial cutting sample method, etc.

  1、修理或更換

  1. Repair or replace

 ?。?)修理:查找故障原因,修復(fù)并采取預(yù)防措施;檢查相關(guān)零件,防止故障擴(kuò)散。

  (1) Repair: Identify the cause of the malfunction, repair and take preventive measures; Check the relevant parts to prevent the spread of faults.

  (2) 更換:正確裝配調(diào)試更換零件,并注意相關(guān)件。

  (2) Replacement: Correctly assemble, debug, and replace parts, and pay attention to relevant parts.

  5、進(jìn)行性能測(cè)定

  5. Conduct performance testing

 ?。?) 啟動(dòng)設(shè)備,調(diào)試裝配后,先手動(dòng)(或點(diǎn)動(dòng))運(yùn)行,再自動(dòng)(或連續(xù))運(yùn)行,先空載運(yùn)行再負(fù)載運(yùn)行測(cè)定。

  (1) Start the equipment, debug and assemble it, run it manually (or jog) first, then automatically (or continuously), run it without load first, and then test it under load.

 ?。?) 調(diào)節(jié)負(fù)載變化,速度由低到高,負(fù)荷由小到大進(jìn)行測(cè)試。

  (2) Adjust load changes, test from low to high speed and from small to large load.

 ?。?) 擴(kuò)大性能試驗(yàn)范圍,根據(jù)需要由局部到系統(tǒng)逐步擴(kuò)大性能測(cè)試范圍,注意非故障區(qū)系統(tǒng)運(yùn)行狀況。如性能滿(mǎn)足要求則交付使用,如不能滿(mǎn)足則重新確定故障部位。

  (3) Expand the scope of performance testing, gradually expanding the scope of performance testing from local to system as needed, and paying attention to the operation status of non fault area systems. If the performance meets the requirements, it will be delivered for use. If it cannot be met, the fault location will be re determined.

  本文由  中空玻璃加工設(shè)備  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://www.xavoip.com/   真誠(chéng)的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from insulating glass processing equipment For more related knowledge, please click http://www.xavoip.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

聯(lián)系我們Contact us

  • 咨詢(xún)熱線:0531-85717458 13705446998
  • 公司地址: 山東省德州市齊河安頭鄉(xiāng)企巢工業(yè)園
  • 掃碼聯(lián)系我們:

截屏,微信識(shí)別二維碼

微信號(hào):13705446998

//
隆昌县| 永靖县| 福鼎市| 池州市| 怀柔区| 阿勒泰市| 光山县| 循化| 水富县| 台北市| 和田县| 苏尼特右旗| 新源县| 荣昌县| 孟津县| 夏津县| 延寿县| 嘉峪关市| 吴川市| 奈曼旗| 白玉县| 清水河县| 卫辉市| 印江| 梁山县| 库伦旗| 集贤县| 宿松县| 尼木县| 略阳县| 武乡县| 云梦县| 烟台市| 罗田县| 沅江市| 凯里市| 乐山市| 绥中县| 开平市| 苏尼特右旗| 商河县|